HOA EV Charger Request: What to Attach So It Gets Approved

If you own a condo or a home in a common interest community in California, Illinois, Maryland or Washington, and you have a deeded or assigned parking space, your HOA board has 60 days from receiving your EV charger request to deny it in writing. After that the statute treats it as approved. The exception in all four is the same: delay caused by "a reasonable request for additional information."

That exception is the reason the packet matters more than the letter. A board that asks for something you left out stops the clock without saying no. A board that gets everything on day one has a much harder time doing either.

The useful discovery, reading the statutes side by side, is that most of them spell out what "everything" means. They list the written promises that, once made, require the association to approve. This page turns those lists into an envelope. Every section was read on 16 October 2026 on the state's own server, except Colorado's, which was read from a FindLaw copy and is flagged where it appears. I am not a lawyer, and nothing here tells anyone how to wire a charger; it describes paperwork, clause by clause.

If you have not yet confirmed that your state has a statute at all, or what your space legally is, start with right-to-charge laws by state. This page assumes the answer was yes.

The approval condition is a list, and you can copy it

The structure is the useful part. California Civil Code §4745(f)(1) does not say the association may approve a charger in the common area or an exclusive use common area. It says "the association shall approve the installation if the owner agrees in writing to do all of the following," and then lists four things. Illinois, Maryland, Washington and Colorado use the same structure. Florida lists what the association "may require," which is a different legal posture but works out to a similar checklist.

So the strongest application is not a persuasive letter. It is a signed agreement that repeats the statute's list back to the board, item by item, with the subsection number next to each promise.

What you agree to CA §4745(f)(1) IL 1085/30(e)(1) MD §11-111.4(d) WA 64.90.513(4) CO 38-33.3-106.8(4) FL 718.113(8)(h)
Follow architectural standards (A) (A) (ii)1.B (a) (b)(I) design specifications 2., limited to dimensions, placement, appearance
Contractor (B) licensed (B) licensed and insured, who also names the association as additional insured (ii)2. licensed (b) familiar with EV infrastructure standards; must assess existing infrastructure (b)(II) licensed and registered, familiar with code requirements 3. licensed and registered firm
Insurance certificate (C) within 14 days of approval (C) within 14 days, naming association, officers, directors, agents (g) before installation, or premium reimbursement (c) within 14 days of approval (b)(IV) within 14 days of consent 4. within 14 days
Pay installation and electricity (D) (D) (d)(2) owner pays (e) electricity plus means of payment (b)(III) installation (8)(c), (e)
Other (E) damage to common areas or other units building codes and safety standards (d) register within 30 days of installation registration within 30 days may be required, (3)(b) bona fide safety requirements, 1.

Two cautions about that table. First, California's (f)(1) list and Illinois's (e)(1) list apply when the station goes in a common area or an exclusive use common area. A charger entirely inside your own unit is governed by the general rule in (a) and the application process in (e) in California, and (a) and (d) in Illinois. One piece reaches inside the unit anyway: California's (f)(3) liability policy applies to a station "whether located within a separate unit or within the common area." Second, Maryland and Washington add a condition that is about the site rather than about you. Maryland's (d)(1)(i) requires that installation "Is reasonably possible" and does not unreasonably impede normal use of the area outside your space; Washington's (4) says the association must approve "if the installation is reasonably possible." Those are the two places a board can push back on facts rather than paperwork, which is why the drawing described below earns its place in the envelope.

Virginia is the outlier. §55.1-1823.1 has no approval list and no deadline, and opens by deferring to anything the declaration or other recorded governing document provides. What it does have is a mandatory indemnity in (C), plus the association's right to require insurance with the association "included as a named insured." A Virginia packet should state the indemnity in the same words the statute uses and offer the insurance up front.

What goes in the envelope, item by item

Think of the packet as answers to questions the board would otherwise ask by letter, each of which would stop the clock.

1. A signed written agreement that mirrors your statute. One page. Each sentence is one promise from your state's list, followed by the citation in parentheses. I agree to engage a licensed contractor to install the charging station (Civ. Code §4745(f)(1)(B)). It reads like a form because it should. A board reviewing it has to find a promise missing to say no, and you have removed that option.

2. The contractor's details, and in Washington an assessment. Name, business name, and licence number, which the board can check against your state's licensing lookup. Washington asks more than the others: RCW 64.90.513(4)(b) requires a contractor familiar with EV infrastructure standards "to assess the existing infrastructure necessary to support the proposed electric vehicle charging station, identify additional infrastructure needs, and install" it. Attach that assessment as a short letter on the contractor's letterhead. Whether the garage feeder or the meter bank has room is exactly the question it answers, and the method behind it is the one in NEC 220.87 spare capacity. In Illinois, attach the contractor's own certificate of insurance too: subsection (e)(1)(B) requires the contractor to name the association, its officers, directors and agents as additional insured and to provide the certificate.

3. Proof that insurance exists now, and when the certificate will follow. The statutes mostly say the certificate is due within 14 days after approval. Do not make the board wait. A letter from your insurer or agent saying the coverage is available, and naming who will be listed, answers the question before it is asked. Maryland is different and stricter: §11-111.4(g)(1)(i) wants the additional-insured certificate "Prior to the installation of the electric vehicle recharging equipment," with premium reimbursement as the alternative in (ii). California's current text asks for "a liability coverage policy" and a certificate within 14 days, then annually; the words "additional insured" do not appear anywhere in §4745 as read on 16 October 2026. A California board form that still demands additional-insured status is quoting an older version, a change covered in more detail in the right-to-charge page linked above.

4. A drawing of where everything goes. Not a wiring diagram. A sketch on the garage plan, or a marked-up photo, showing where the charger mounts, which path the conduit takes, where it connects, and that nothing crosses into the drive aisle or a neighbour's stall. This is the document that answers Maryland's "unreasonably impede" condition and the "reasonably possible" test in Maryland and Washington before anyone raises them. It also lets the board apply its architectural standards to something concrete instead of asking for "more details," which is the request most likely to stop the clock. Your contractor produces this; the quote you already have should name the same route and length. The line-by-line quote guide shows where that appears.

5. How the electricity will be measured and paid for. Florida's §718.113(8)(c) requires electricity for an owner's station to be "separately metered or metered by an embedded meter." Washington's (4)(e) makes the owner pay for usage and for "the required means to facilitate payment for the electricity." Illinois (e)(2)(C) bases the electricity cost on either an embedded submetering device or a reasonable calculation from average miles driven, the EPA efficiency figure and the common-area electricity cost. State the method in the packet: a separate utility meter, an embedded meter in the charger, or another arrangement the board already uses. If the building has no settled method, that conversation is its own document, and who pays in a shared garage goes through the four methods and the legal problems of each.

6. A permit statement. Washington RCW 64.90.513(5)(a) says the owner "must obtain any permit or approval" the local government requires. Maryland §11-111.4(e) says the same of county or municipal permits, and Florida (8)(g) makes the installing owner responsible for complying with applicable laws. One sentence covers it: you or your contractor will pull the permit, and you will give the association a copy of the final inspection sign-off. That sign-off is also the document a later buyer's inspector will ask for.

7. A registration promise, where the statute has one. Washington (4)(d) requires registration with the association within 30 days after installation. Colorado's (3)(b) lets an association require registration within thirty days. Add the line and calendar it.

8. A short cover letter. Last, and shortest. It names the statute, lists the enclosures by number, and gives the date. It does not argue.

Day 60 depends on a date you can prove

The four deemed-approval clauses, California §4745(e), Illinois 1085/30(d), Maryland §11-111.4(c)(3) and Washington 64.90.513(3)(c), all count from receipt of the application. Not from the date you wrote it or emailed it. Receipt.

So delivery is part of the packet. In California, the Davis-Stirling Act has a general rule in Civil Code §4035 for documents the act requires be delivered to an association: they go to the person named in the annual policy statement to receive documents, or, if nobody is named, to the president or secretary. Methods listed there include email, and personal delivery, each only if the association has assented to that method (an association that accepts personal delivery must give a written receipt), and first-class, registered or certified mail, which needs no assent. Section 4745 does not itself use the word "delivered," so treat §4035 as the safest route rather than a requirement, and pick a method that leaves a dated record either way.

Then watch for the one move that legitimately pauses the clock. Every one of the four clauses excepts delay that is "the result of a reasonable request for additional information." If a request arrives, answer it in writing, by the same traceable method, and keep both dates. A request asking for something already in your packet is hard to call reasonable. A request for something you left out is easy to call reasonable. That difference is the whole argument for sending everything on day one.

Florida, Colorado and Virginia have no deemed-approval text in the sections read. There, a silent board is just a silent board, and the clock that matters is whatever your own governing documents set.

A California denial has to say why

California owners get a second tool that sits outside the charger statute. Section 4745(e) requires the application to be processed "in the same manner as an application for approval of an architectural modification," and California's general rule for architectural review is Civil Code §4765. Read as of 16 October 2026, it requires:

  • a "fair, reasonable, and expeditious procedure" that is included in the governing documents and states the maximum time for a response, under (a)(1);
  • a decision made in good faith that is not "unreasonable, arbitrary, or capricious," under (a)(2);
  • a written decision which, if the request is turned down, includes "both an explanation of why the proposed change is disapproved and a description of the procedure for reconsideration of the decision by the board," under (a)(4);
  • a right to reconsideration by the board at an open meeting, under (a)(5), unless the decision was already made by the board, or a body with the same membership, at a meeting that satisfied the open-meeting rules.

Subsection (c) also requires the association to give members annual notice of which changes need approval, with a copy of the review procedure. If you cannot find that notice, ask for it in writing before you apply. It tells you who receives applications and how long the documents themselves say the board may take.

A denial letter missing the explanation or the reconsideration procedure is a defective denial under §4765(a)(4). Whether a defective written denial still counts as a denial "in writing" for §4745(e)'s 60-day clock is a question for a lawyer, not this page. But it is a question worth asking, and the letter is the evidence.

What the board cannot ask for, and one Illinois surprise

Some requests can be declined politely, citation attached.

  • A placement fee in Washington. RCW 64.90.513(3)(d): the association may not charge a fee for placement, and a processing fee is allowed only if the same fee exists for all architectural modification applications. Ask for the fee schedule that applies to other modifications.
  • A fee for placement or use in Colorado, in or on the owner's unit, under 38-33.3-106.8(2)(b). The exceptions in that paragraph are reimbursement of the actual cost of electricity the association provided, or alternatively a reasonable fee for access. (FindLaw copy, last updated 1 January 2025 per the page; the official Colorado code is published through Lexis and was not checked.)
  • Any application at all, in some Washington communities. RCW 64.90.513(1)(c) says an association of single-family homes, site condominiums, or a planned use development where the units are not immediately adjacent may not require approval unless the station is installed within or upon a common element or is connected to a common electrical power supply. If neither applies, there may be no packet to send.
  • Insurance for an ordinary outlet in California and Illinois. California §4745(f)(4) and Illinois (e)(5) both say an owner is not required to maintain a homeowner liability policy for an existing National Electrical Manufacturers Association standard AC power plug. If the plan is Level 1 on an outlet already there, that is a different, smaller request.
  • Architectural standards that do the statute's work in reverse. Florida's (8)(h)2. allows standards on dimensions, placement or appearance only "provided that such standards may not prohibit the installation" or substantially increase its cost. California and Washington define a reasonable restriction as one that does not significantly increase cost or significantly decrease efficiency or performance.

Now the surprise. California §4745(k) awards attorney's fees to "the prevailing plaintiff," and Washington RCW 64.90.513(10)(b) to "any prevailing unit owner." Illinois 1085/30(i) says the court "shall award reasonable attorney's fees to a prevailing party." Not limited to the owner. The civil penalty for a willful violation is also smaller there: up to $500 in Illinois under (h), against up to $1,000 in California §4745(j) and Washington (10)(a). Read literally, that leaves room for an Illinois owner who sues and loses to be ordered to pay the association's fees, a risk the California and Washington texts do not create. How Illinois courts apply the phrase was not checked for this page, so treat it as a reason to have the complete packet in hand first and an Illinois attorney's view before filing.

The cover sheet, written before anything else

Before calling a contractor, open your state's section on its official server, note the date you read it, and write the one-page agreement from item 1: one promise per line, subsection number in parentheses, a blank for the contractor's licence number, a blank for the insurer. Every gap left in that sheet is a document still to collect, and every line filled is a request for information the board can no longer send. File the dated delivery receipt with it when it goes out.

Frequently asked questions

What does an HOA charger application legally have to include?

No statute read for this page prescribes a form, but five of them list the written promises that, once made, oblige the association to approve, and Florida lists what the association may require. In California Civil Code 4745(f)(1), Illinois 765 ILCS 1085/30(e)(1), Maryland Real Property 11-111.4(d), Washington RCW 64.90.513(4), Colorado 38-33.3-106.8(4) and Florida 718.113(8)(h) those items cover the same ground: follow the association's architectural standards, use a licensed or qualified contractor, provide insurance on a stated schedule, and pay installation and electricity costs. A packet that makes each promise in writing, with the clause number beside it, leaves the board very little to deny.

When does the 60-day deemed-approval clock start?

On the date the association receives the application, in the four states that have the clause: California 4745(e), Illinois 1085/30(d), Maryland 11-111.4(c)(3) and Washington RCW 64.90.513(3)(c). Each one also stops the clock for delay caused by a reasonable request for additional information. Florida, Colorado and Virginia have no such clause in the text read on 16 October 2026. Send the application in a way that produces a dated receipt, and answer any request for more information in writing the same way.

Can the association make me pay an application fee?

It depends on the state. Washington RCW 64.90.513(3)(d) bars any fee for placement and allows a processing fee only if the same fee already applies to every architectural modification application. Colorado 38-33.3-106.8(2)(b) bars fees for placement or use of a charging system in the owner's unit, with narrow exceptions. California, Illinois, Maryland, Florida and Virginia say nothing specific about application fees in the sections cited here, so whatever your governing documents charge for any architectural request is the likely ceiling.

Does Illinois really let the association recover attorney's fees from me?

The Illinois text reads that the court shall award reasonable attorney's fees to a prevailing party in an action by a unit owner seeking to enforce the section. California 4745(k) awards fees to a prevailing plaintiff and Washington RCW 64.90.513(10)(b) to a prevailing unit owner, so those two run one way. The Illinois wording is not limited to the owner. That is a reason to build a complete packet before anyone talks about court, and to have an Illinois attorney read the clause before relying on it.